سديم للمقاولات

06

Design & Build

A single track from 3D visualisation to handover: you approve how your project or its facade will look on screen — with materials matched to supplier samples — before concrete is poured, then it is built by the same hand. The visualisation becomes the reference delivery is measured against, not a marketing image, so variation orders drop and the approval cycle shortens.

What the scope covers

The line items this service covers. Each one maps to a priced line in the bill of quantities.

  1. Survey of existing conditions and 3D modelling
  2. 3D visualisation of the project or its façade
  3. Material approval against supplier samples
  4. Execution by the same team through handover
  5. Façade works: cladding, aluminium and external lighting

How we work

Four declared stages, from first visit to warranty

  1. Study & Quotation

    A site visit and drawing review, followed by a detailed bill of quantities with itemised lines — not a single opaque lump sum.

    Output: an itemised quotation

  2. Contract & Planning

    A contract that fixes specification and responsibility, attached to a schedule and a payment plan tied to defined progress milestones.

    Output: contract and schedule

  3. Execution & Supervision

    A resident engineer on site, documented material testing, and a weekly photo report showing actual progress against plan.

    Output: a weekly report

  4. Handover & Warranty

    A final snag list closed before handover, as-built drawings, and a written warranty on structural works and waterproofing.

    Output: as-builts + warranty

Work in this scope

Projects delivered by Sadeem Construction under this service.

All projects

Questions about this service

What usually gets asked before contracting this scope

A 3D visualisation of your project or its façade, with materials matched to supplier samples, before concrete is poured. That visualisation becomes the reference delivery is measured against.

Yes. Our work includes the Hittin villa façade: a survey and model of the existing façade, a visualisation in four angles with day and night lighting, then natural stone cladding, aluminium works and external lighting.

One party is accountable for both design and execution, so designer and contractor cannot pass the blame at the first defect, variation orders drop and the approval cycle shortens.

Have a project in this scope?

Send us the details and our engineering team replies within one business day.

Request a study and quotation
Design & Build in Riyadh